Orlando pool resurfacing

Pool Replastering in Orlando

Replastering replaces the worn cement finish inside a concrete pool. The pool is emptied with its hydrostatic relief valve managed, loose and hollow plaster is chipped back to a sound base, new plaster goes on in one continuous pass, and the fill and first four weeks follow the National Plasterers Council start-up procedure.

Signs the plaster has reached the end

White pool plaster is a thin layer of white cement and marble sand troweled over the concrete shell. It wears from the water side. When the water sits outside its balanced range for long stretches, low calcium, low pH or low alkalinity dissolve the most soluble part of the cement first, and the surface turns rough, blotchy and pitted. The National Plasterers Council calls this etching, and it shows first around tile, lights and fittings. Other signs are a surface that scratches swimsuits and feet, stains that come back after brushing, and patches that sound hollow when tapped. Hollow spots and flaking are a bonding problem rather than wear, and those are covered on our crack and delamination repair page.

Emptying a pool in Central Florida ground

Replastering starts with an empty pool, and an empty concrete shell sitting in wet soil is lighter than the groundwater pushing up on it. That uplift can lift a shell out of the ground, which engineers call a popped pool. The Florida Building Code requires an approved hydrostatic relief device in pools built where a water table is expected, and that valve usually sits in the main drain. Before pumping, we find it, confirm it opens, and discharge the pool water well away from the shell so it does not soak straight back under the floor. If the ground is saturated after days of rain, the right answer can be to wait.

Chip-out, bond coat and new plaster

New plaster only lasts as long as its grip on what is underneath. Old plaster that is loose, hollow, painted or heavily layered is chipped back to sound material, and the surface is cleaned so no dust or scale is left. Where the substrate calls for it, a bond coat goes on first. The new plaster is then troweled in one continuous pass wherever possible, because a joint where work stopped and restarted is a weak line. The pool is filled as soon as the finish has set: water is what cures cement plaster, and a finish left to dry in the sun shrinks and cracks.

The first 28 days

The NPC start-up procedure treats the first four weeks as part of the job. The fill runs without stopping until the water reaches the middle of the skimmer. The whole surface is brushed at least twice a day while plaster dust is still coming off, water chemistry is tested daily, chlorine waits 48 hours, the heater stays off, and wheeled cleaners stay out of the pool for the full 28 days. Owners who want a harder-wearing surface than white plaster can compare quartz aggregate finishes and pebble interiors before the chip-out begins.

What sets the schedule? The size of the pool, how much old plaster has to be chipped out, how wet the ground is when it is time to drain, weather on application day, and the 28-day start-up that follows the fill.

Frequently asked questions

Is it safe to drain my pool to replaster it?
It can be, when it is done with the groundwater in mind. An empty shell in saturated ground can be pushed upward, so the hydrostatic relief valve in the main drain is opened, the water is pumped well away from the pool, and draining is put off if the ground is soaked after heavy rain.
Why can’t I turn the heater on after replastering?
The National Plasterers Council start-up procedure says not to run the pool heater for 28 days. The new finish is still curing and is most prone to staining, scaling and discoloration in that first month.

Often done in the same drain

These usually come up in the same drain, and can be quoted from the same visit:

Free estimate

Tell us about the pool

Tell us where the pool is and what you’re seeing. We’ll call back to book a look at the pool and bring finish samples.

  • Shell, tile and coping inspected before anything is quoted
  • Each item priced separately, so you choose what gets done
  • Water table and drain relief checked before the pool is emptied
  • Brushing and water balancing through the new finish’s cure

Free resurfacing estimate

Tell us about the pool — we’ll call back to book a look.

Or call (689) 305-2500

Got it, thank you.

We’ll call to set up a time to see the pool. To talk sooner, call (689) 305-2500